I swung by the house again this weekend. The bathroom walls and ceiling are fully assembled and plastered. The floor and shower are fully tiled. The shower needs a knob, shower head, and door.
Looks like once the reinstall the toilet and sink, slap up some paint, that'll be it.
For them. I've still got a lot of work.
No comments:
Post a Comment